Super Corridor's metro link to Radisson Square inches closer, reshaping Indore's connectivity map.
Enquire NowIndore's Yellow Line metro is edging closer to one of its most-watched milestones — connecting Super Corridor to Radisson Square. This stretch matters because it links the city's fastest-growing residential belt to a commercial and hospitality hub that residents, including those at established communities like DLF Garden City on AB Bypass Road, have been waiting years to see plugged into rail transit.
The currently operational section is a 6 km priority stretch, and a 6 km first phase, linking Devi Ahilya Bai Holkar Terminal to Veerangana Jhalkari Bai Station entered operations on 31 May 2025 and it was officially inaugurated by Prime Minister Narendra Modi via video conferencing from Bhopal. Beyond this, the priority section from Devi Ahilya Bai Holkar Terminal to Radisson Square is under-construction with a distance of 16.21 km, and the specific leg from Super Corridor onward to Radisson Square covers roughly 11 kilometres across 11 stations, per project documentation.
Officials have repeatedly flagged this stretch as being close to completion. As per a project update, the expansion will convert the existing Super Priority Corridor into a longer stretch of nearly 17 km, improving connectivity and passenger reach, with most civil and systems work on the extended corridor nearing completion. Reviews of the timeline have involved the state's top leadership, with reports noting that Chief Minister Shri Mohan Yadav is expected to review project progress soon, including timelines and alignment plans.
Timelines, however, have shifted more than once. An early target pointed to a January 2026 rollout, with reports stating metro management plans to begin commercial runs on the 17.5 km route up to Radisson Square by January 2026. That date slipped, and by March 2026 the picture was still unsettled: the official MPMRCL website confirms the 2025 commercial launch of the first section, while January 2026 reports said the longer corridor had completed trial runs and testing and was awaiting final clearances for broader public operations. A fresh target of 18 June 2026 was then floated, with local reports pointing to a commercial run from Gandhi Nagar to Radisson Square beginning that date in the presence of state leadership. Yet by late June, ground reports again pointed to delay: as of June 2026, the extended Indore Metro Priority Corridor has not started full commercial operations despite successful safety inspections and trial runs, and reports indicate that the launch has been delayed again.
For homebuyers, the pattern of near-misses shouldn't overshadow the bigger structural shift underway. Industry commentary frames the moment well: metro-led growth usually changes how a city expands, and in Indore this matters because metro-led growth usually changes how a city expands — travel time improves, new catchments open up, commercial activity starts moving toward connected corridors, and in Indore, that conversation is now centered on the Super Corridor, Gandhi Nagar, Vijay Nagar, Radisson Square, Airport-facing belts, and the wider Yellow Line impact zone. Analysts also separate the micro-markets by maturity: Indore Metro is already operational on a 6.3 km stretch, and MPMRCL lists 31 May 2025 as the commercial start date for that section, while the Radisson Square leg remains the one to watch for early-mover advantage.
Super Corridor's fundamentals independent of the metro are already strong. The locality's appeal rests partly on road and industrial connectivity: the Super Corridor links Indore's city center to Pithampur, one of the largest industrial hubs in Madhya Pradesh, ensuring easy access to job opportunities for residents, especially those working in the manufacturing and automotive sectors. Established gated communities here, such as DLF Garden City — a thoughtfully planned plotted development located on AB Bypass Road, Indore, designed for those who aspire to build a home that reflects their lifestyle and aspirations — stand to benefit directly once the Radisson Square leg goes live, cutting commute times to the city's commercial core.
For now, the sensible approach for buyers and residents is to track official confirmations rather than react to every new date floated in reports. Portals covering the corridor advise as much, noting that inspection progress doesn't always translate into an immediate public launch, and that a few days of stated delay can stretch further once final approvals are pending. Once the Radisson Square stretch does open to commercial traffic, it will complete one of the most anticipated connectivity upgrades for Indore's western and central residential belts, including Super Corridor, Vijay Nagar and the AB Bypass Road catchment.
Mahadevapura, Bangalore
Grade A Office Spaces • Price on request
Large-format campus on Bangalore's ORR
Manglia, AB Bypass Road, Indore
Plots, 3-4 BHK Villas • Rs 43.7 Lac onwards
192-acre integrated township
Sector 70A, Gurugram
2, 3, 4 BHK • Price on Request
Upcoming SPR corridor address
Sector 54, Gurugram
Retail Shops, Coworking Spaces • Price on Request
4.8 lakh sq ft retail & coworking plaza
Andheri West, Mumbai
3, 4 BHK • Price on Request
Next phase of DLF's sold-out Mumbai debut
Bandra Kurla Complex, Mumbai
3, 4 BHK + Retail/Office • Price on Request
Mixed-use address at BKC
Bidadi, Bangalore
2, 3, 4 BHK • Price on Request
Upcoming DLF homes on Mysore Road
Sector 42, Gurgaon
4, 5 BHK • Price on Request
Super-luxury successor to The Camellias
We'd love to hear from you. Fill in the form and our team will get back to you shortly.
Everything on this page is intended purely as a guide and creates no binding obligation. Details such as pricing, dimensions, and imagery can change without prior notice. Kindly cross-check all information before making a decision. About · Projects
Share your details and our expert will call you back.