Indore Metro Yellow Line Launch

India's first metro service in Madhya Pradesh begins operations.

Enquire Now

Indore Metro's Game-Changing Moment: The May 2025 Launch That Transformed Urban Mobility

Prime Minister Narendra Modi virtually inaugurated the first section of the Super Priority Corridor of the Indore Yellow Metro Line on 31 May 2025, during an official visit to the state of Madhya Pradesh. Commercial transport services commenced on 1 June 2025 along the first 6 km stretch of the line, running from Devi Ahilya Bai Holkar Terminal to Veerangana Jhalkari Bai Station, providing access through five new elevated stations. This marked the arrival of rapid urban transit to Madhya Pradesh and positioned Indore as a modern, connected city.

The line is operated by Alstom-built Movia metro trains, featuring the latest generation of CBTC signalling systems to ensure safe and reliable service. The first trainset was produced in a record time of 14.5 months from the issuance of the Notice to Proceed (NTP), and was delivered to Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) in August 2023. The infrastructure reflects global standards and represents India's growing capability in metro rail manufacturing.

Why the May 2025 launch mattered for homebuyers and investors: Over six million residents of the city are expected to benefit directly and indirectly from the Indore Metro project. The Indore Metro project has improved the city's sentiment for long-term real estate prospects. The metro project and the smart city mission have encouraged investors to look into commercial developments as well. The initial response was strong—the line carried 50,000 passengers during its first three days of operation with free travel available to passengers until June 7.

Line 3's ring provides multiple nodes where transit-oriented development can flourish — residential projects, retail, offices, and hospitality will all benefit from improved footfall and accessibility. Already Indore's premium IT and commercial spine, the Super Corridor stands to gain even more as Metro stations reduce travel friction for professionals and make premium projects more attractive to buyers and corporates. Real estate stakeholders quickly recognized that metro-linked locations would command premium valuations as urban migration accelerated.

The project's broader scale reflects India's infrastructure push. The project is being developed at an estimated cost of ₹7,500 crore. The Super Priority Corridor alone accounts for approximately ₹1,520 crore of the total project cost. This investment underscores government commitment to sustainable urban mobility. Looking ahead, the priority corridor-2 from Super Corridor 2 to Radisson Square was inaugurated on 5 September 2026 with regular service starting on 6 September 2026. The second phase expansion brings the metro even closer to high-density residential and commercial zones, validating early investor confidence.

DLF Projects

DLF East Bangalore Business District, Mahadevapura
Upcoming

DLF East Bangalore Business District, Mahadevapura

Mahadevapura, Bangalore

Grade A Office Spaces • Price on request

Large-format campus on Bangalore's ORR

DLF New Indore Project
Upcoming

DLF New Indore Project

Manglia, AB Bypass Road, Indore

Plots, 3-4 BHK Villas • Rs 43.7 Lac onwards

192-acre integrated township

DLF Sector 70A Gurugram
Upcoming

DLF Sector 70A Gurugram

Sector 70A, Gurugram

2, 3, 4 BHK • Price on Request

Upcoming SPR corridor address

DLF Summit Plaza
Upcoming

DLF Summit Plaza

Sector 54, Gurugram

Retail Shops, Coworking Spaces • Price on Request

4.8 lakh sq ft retail & coworking plaza

RERA: GGM/488/220/2021/56
DLF Westpark Phase 2, Andheri West, Mumbai
Upcoming

DLF Westpark Phase 2, Andheri West, Mumbai

Andheri West, Mumbai

3, 4 BHK • Price on Request

Next phase of DLF's sold-out Mumbai debut

DLF Bandra Kurla Complex
Pre-Launch

DLF Bandra Kurla Complex

Bandra Kurla Complex, Mumbai

3, 4 BHK + Retail/Office • Price on Request

Mixed-use address at BKC

DLF BIDADI
Pre-Launch

DLF BIDADI

Bidadi, Bangalore

2, 3, 4 BHK • Price on Request

Upcoming DLF homes on Mysore Road

DLF CAMELLIAS 2 (THE CAMELLIAS 2)
Pre-Launch

DLF CAMELLIAS 2 (THE CAMELLIAS 2)

Sector 42, Gurgaon

4, 5 BHK • Price on Request

Super-luxury successor to The Camellias

Connect With Us

DLF

We'd love to hear from you. Fill in the form and our team will get back to you shortly.

Request a Callback

Back

Good to Know

When did Indore Metro's first stretch start operations?
Commercial transport services commenced on 1 June 2025 along the first 6 km stretch of the line, running from Devi Ahilya Bai Holkar Terminal to Veerangana Jhalkari Bai Station.
How long is the Super Priority Corridor?
The first 6 km stretch provides access through five new elevated stations.
What trains operate on the Indore Metro?
The line is operated by Alstom-built Movia metro trains, featuring the latest generation of CBTC signalling systems. Alstom designed and manufactured these trains in India at its state-of-the-art facility in Savli, Gujarat.
How many people use the Indore Metro daily?
The line carried 50,000 passengers during its first three days of operation with free travel available to passengers until June 7. Current ridership has grown as the network expanded and fares became standard.
What's the total cost of the Indore Metro project?
The project is being developed at an estimated cost of ₹7,500 crore. The Super Priority Corridor alone accounts for approximately ₹1,520 crore of the total project cost.
How much of the Yellow Line is now operational?
The existing six-km Gandhi Nagar-Super Corridor-3 stretch was connected with an 11-km extension from Super Corridor-3 to Malviya Nagar Chauraha, creating a continuous 17-km operational route with 16 stations.
What impact has the metro had on Indore's real estate market?
Areas around the station and metro corridors have seen multifold price appreciation. Demand for housing in neighborhoods like Super Corridor, Rau, and Indore-Ujjain Road is rising. Enhanced connectivity attracts retail, office, and hospitality projects.
Which areas benefit most from metro connectivity?
Already Indore's premium IT and commercial spine, the Super Corridor stands to gain even more as Metro stations reduce travel friction for professionals and make premium projects more attractive to buyers and corporates.
How does the metro support Indore's growth vision?
The metro can be an ideal focal point for transit-oriented development for the planned growth of the city. It enables planned, sustainable expansion across multiple corridors and catchments.
Will more metro lines be built in Indore?
The Indore Yellow Metro Line is the first of five metro corridors planned for construction, collectively covering a distance of 124 km. Future phases will extend the network significantly.

Everything on this page is intended purely as a guide and creates no binding obligation. Details such as pricing, dimensions, and imagery can change without prior notice. Kindly cross-check all information before making a decision. About · Projects