Gurugram Metro: Bridging Old and New

28.5 km elevated corridor connecting Old Gurugram to Cyber City hub.

Enquire Now

Gurugram Metro Project Accelerates: Game-Changer for Sector 24 Real Estate

Gurugram's metro project achieved a major milestone with the successful installation of the first 160-tonne U-girder near Cyber Park in August 2026. The Union Cabinet approved Metro Connectivity from HUDA City Centre to Cyber City covering 28.50 km with 27 stations, with a total completion cost of Rs 5,452 crore.

Civil construction is actively underway on Phase 1 of the 15.2 km stretch from Millennium City Centre to Sector 9, with over 900 pillars being cast through a Dilip Buildcon and RBL joint venture. Phase 2 (Sector 9 to Cyber City) is currently in the tendering stage, with civil contracts expected to be awarded by March 2026. The full 28.5 km loop is targeted for completion by mid-2027.

Impact on Sector 24 Real Estate

With the full integration of the Rapid Metro Phase 3 and automated skywalks connecting residential blocks to corporate towers, Sector 24 is becoming the primary choice for professionals who value time and efficiency. The 2026 expansion of the Ambience Mall Flyover and AI-based traffic signaling have decoupled local Sector 24 traffic from highway transit, making airport access predictable at 15 minutes even during peak hours.

While Sector 24 is fully developed, it continues to benefit from infrastructure improvements with road widening, better drainage systems, and public space beautification by the Gurugram Metropolitan Development Authority. Property appreciation in Sector 24 is steady rather than dramatic, making it ideal for conservative investors and end-users looking for safe, long-term investment.

Market Outlook and Expert Expectations

Realty experts anticipate a surge in prices, estimating a 15 per cent increase due to the new metro connector. Daily ridership is projected at 5.4 lakh by 2026, growing to over 7.2 lakh by 2031. For the first time, Old Gurgaon will be directly linked with New Gurgaon and Cyber City, making it easier for commuters to access job hubs, residential clusters, and commercial districts.

The metro project represents a transformative shift in Gurugram's connectivity landscape, positioning Sector 24 as a bridge between established employment zones and emerging residential corridors—a compelling play for both professionals seeking proximity to workplaces and investors betting on sustained infrastructure-driven appreciation.

DLF Projects

DLF East Bangalore Business District, Mahadevapura
Upcoming

DLF East Bangalore Business District, Mahadevapura

Mahadevapura, Bangalore

Grade A Office Spaces • Price on request

Large-format campus on Bangalore's ORR

DLF New Indore Project
Upcoming

DLF New Indore Project

Manglia, AB Bypass Road, Indore

Plots, 3-4 BHK Villas • Rs 43.7 Lac onwards

192-acre integrated township

DLF Sector 70A Gurugram
Upcoming

DLF Sector 70A Gurugram

Sector 70A, Gurugram

2, 3, 4 BHK • Price on Request

Upcoming SPR corridor address

DLF Summit Plaza
Upcoming

DLF Summit Plaza

Sector 54, Gurugram

Retail Shops, Coworking Spaces • Price on Request

4.8 lakh sq ft retail & coworking plaza

RERA: GGM/488/220/2021/56
DLF Westpark Phase 2, Andheri West, Mumbai
Upcoming

DLF Westpark Phase 2, Andheri West, Mumbai

Andheri West, Mumbai

3, 4 BHK • Price on Request

Next phase of DLF's sold-out Mumbai debut

DLF Bandra Kurla Complex
Pre-Launch

DLF Bandra Kurla Complex

Bandra Kurla Complex, Mumbai

3, 4 BHK + Retail/Office • Price on Request

Mixed-use address at BKC

DLF BIDADI
Pre-Launch

DLF BIDADI

Bidadi, Bangalore

2, 3, 4 BHK • Price on Request

Upcoming DLF homes on Mysore Road

DLF CAMELLIAS 2 (THE CAMELLIAS 2)
Pre-Launch

DLF CAMELLIAS 2 (THE CAMELLIAS 2)

Sector 42, Gurgaon

4, 5 BHK • Price on Request

Super-luxury successor to The Camellias

Connect With Us

DLF

We'd love to hear from you. Fill in the form and our team will get back to you shortly.

Request a Callback

Back

Good to Know

When will the Gurugram Metro be fully operational?
The full 28.5 km loop is targeted for completion by mid-2027. Trial runs for Phase 1 are tentatively scheduled to begin in early 2027.
How many stations will the metro have and which areas will it cover?
The metro route will comprise 27 stations, including Sector 45, Cyber Park, Sector 46, Sector 47, Sector 48, Technology Park, Udyog Vihar Phase 6, Sector 10, Sector 37, Basai, Sector 9, Sector 7, Sector 4, Sector 5, Ashok Vihar, Sector 3, Krishna Chowk, Palam Vihar Extension, Palam Vihar, Sector 23-A, Sector 22, Udyog Vihar Phase 4 and CyberHub.
What is the current construction status?
Civil construction is actively underway on Phase 1 of the 15.2 km stretch from Millennium City Centre to Sector 9, with over 900 pillars being cast through a Dilip Buildcon and RBL joint venture.
How much will the metro project cost?
The total completion cost of the project will be Rs 5,452 crore, with standard gauge of 1435 mm (5 ft 8.5 inches) and the entire project being elevated.
What impact will the metro have on property prices in Sector 24?
Realty experts anticipate a 15 per cent increase in prices due to the new metro connector. Property appreciation in Sector 24 is steady rather than dramatic, making it ideal for conservative investors looking for safe, long-term investment.
Will the metro connect to existing Delhi Metro lines?
The 26.65-km main corridor from HUDA City Centre to Cyber City will provide depot interchange with the Delhi Metro's Yellow Line at HUDA City Centre and will provide direct connectivity to a large part of Gurugram with Delhi.
How close is Sector 24 to the metro corridor and Cyber City?
Sector 24 is near DLF Cyber City, U Block DLF Phase 3 and DLF Phase 3. Cyber City is 4-5 km away, serving as the major IT and corporate hub.
What are the expected passenger volumes once the metro is operational?
By 2026, daily ridership is projected at 5.4 lakh, growing to over 7.2 lakh by 2031.
Is there infrastructure support for the metro, like depots and workshops?
A new depot-cum-workshop for the upcoming metro line between Millennium City Centre and Cyber City will be constructed in Sector 33, estimated to cost around Rs 410 crore, to support train stabling, inspection, and maintenance for the 28.5 km elevated metro line.
What connectivity improvements are planned in Sector 24 beyond the metro?
Sector 24 is a pilot for Gurugram's 'Sky-Grid' with enclosed, air-conditioned pedestrian bridges connecting major residential clusters directly to Cyber Green and Cyber City. AI-based traffic signaling has improved airport connectivity to a predictable 15 minutes even during peak hours.

Everything on this page is intended purely as a guide and creates no binding obligation. Details such as pricing, dimensions, and imagery can change without prior notice. Kindly cross-check all information before making a decision. About · Projects