New greenfield corridors around Zirakpur and Mohali promise faster commutes and stronger property value.

Enquire Now

Tricity's Rs 5,278-Crore Highway Push: What It Means for Homebuyers Near Zirakpur, Mohali and Chandigarh Airport

For years, anyone driving between Chandigarh, Mohali, Panchkula and Zirakpur has known the drill: bumper-to-bumper traffic at the Zirakpur-Patiala light point, long queues near Airport Road, and unpredictable delays that turn a 20-minute trip into an hour. That's changing fast. The Centre has rolled out a Rs 5,278-crore National Highway package covering three major projects designed to decongest the Tricity and dramatically improve access to Chandigarh International Airport, Mohali's Aerocity and the wider region.

At the centre of this push is the newly operational 31.23-km Zirakpur-Kurali Greenfield Highway. Built under the Bharatmala Pariyojana scheme, this corridor opened to traffic on December 22, 2025 after facing repeated delays tied to land acquisition and compensation disputes with local landowners. The highway connects IT Chowk near Chandigarh's Shaheed Bhagat Singh International Airport with the Kurali-Chandigarh Road, giving long-distance traffic heading to Himachal Pradesh and Jammu & Kashmir a way to bypass the crowded Airport Road entirely.

The second piece of the package is the 19.20-km Zirakpur Bypass, a six-lane project pegged at roughly Rs 1,878 crore. This bypass will connect NH-7 (Zirakpur-Patiala) with NH-5 (Zirakpur-Parwanoo), pulling through-traffic away from the densely populated core of Zirakpur. Rounding off the trio is the 10.30-km Chandigarh Airport-Aerocity Greenfield Highway, an approximately Rs 1,464-crore extension of NH-205A that will directly link Chandigarh International Airport with Mohali's Aerocity and the fast-growing residential belts nearby.

Prime Minister Narendra Modi inaugurated the completed Zirakpur-Kurali stretch and laid foundation stones for the remaining two corridors on July 17, 2026, signalling the government's intent to push these projects through on a firm timeline. Officials involved with the region's infrastructure planning have pointed out that a rapid development of Mohali, Zirakpur and Panchkula around Chandigarh has significantly increased traffic pressure, prompting the ring-road discussions that eventually led to this package.

Local residents and commuters are cautiously optimistic. In an Open House discussion carried by a regional daily, one respondent noted that diverting heavy and long-distance vehicles away from crowded areas like Zirakpur and Panchkula will ease pressure on major highways and local roads. Another commuter pointed out that the six-lane bypass will serve as an alternative route for vehicles heading towards Himachal Pradesh, reducing load on the Ambala-Chandigarh highway and Zirakpur's busy intersections.

Why does this matter to homebuyers? Better airport access, reduced congestion, and faster regional travel are expected to strengthen growth in residential, commercial, and logistics-driven real estate across the Tricity. These three projects also form part of the larger 244-km Tricity Ring Road vision, which aims to permanently reroute inter-state traffic away from the urban core of Chandigarh, Mohali and Panchkula.

For DLF, which has an established residential footprint across the Tricity — from The Valley and The Valley Gardens in Panchkula's Sector 3 to Hyde Park Estate in Mullanpur's New Chandigarh township — improved regional connectivity strengthens the long-term investment case for buyers already eyeing these foothill and airport-adjacent addresses. Faster, signal-free access to Chandigarh Airport and reduced dependence on choke points like Zirakpur's traffic lights add tangible value to homes positioned along or near these new corridors, even for projects a little further out toward Panchkula and Pinjore.

Buyers evaluating a purchase in this belt should track construction progress on the Zirakpur Bypass and the Airport-Aerocity corridor, since both remain under active construction with expected multi-year completion windows. As with any infrastructure-linked real estate story, the value uplift tends to build gradually — first through improved commute experience, then through broader commercial and retail activity that follows better connectivity.

DLF Projects

DLF East Bangalore Business District, Mahadevapura
Upcoming

DLF East Bangalore Business District, Mahadevapura

Mahadevapura, Bangalore

Grade A Office Spaces • Price on request

Large-format campus on Bangalore's ORR

DLF New Indore Project
Upcoming

DLF New Indore Project

Manglia, AB Bypass Road, Indore

Plots, 3-4 BHK Villas • Rs 43.7 Lac onwards

192-acre integrated township

DLF Sector 70A Gurugram
Upcoming

DLF Sector 70A Gurugram

Sector 70A, Gurugram

2, 3, 4 BHK • Price on Request

Upcoming SPR corridor address

DLF Summit Plaza
Upcoming

DLF Summit Plaza

Sector 54, Gurugram

Retail Shops, Coworking Spaces • Price on Request

4.8 lakh sq ft retail & coworking plaza

RERA: GGM/488/220/2021/56
DLF Westpark Phase 2, Andheri West, Mumbai
Upcoming

DLF Westpark Phase 2, Andheri West, Mumbai

Andheri West, Mumbai

3, 4 BHK • Price on Request

Next phase of DLF's sold-out Mumbai debut

DLF Bandra Kurla Complex
Pre-Launch

DLF Bandra Kurla Complex

Bandra Kurla Complex, Mumbai

3, 4 BHK + Retail/Office • Price on Request

Mixed-use address at BKC

DLF BIDADI
Pre-Launch

DLF BIDADI

Bidadi, Bangalore

2, 3, 4 BHK • Price on Request

Upcoming DLF homes on Mysore Road

DLF CAMELLIAS 2 (THE CAMELLIAS 2)
Pre-Launch

DLF CAMELLIAS 2 (THE CAMELLIAS 2)

Sector 42, Gurgaon

4, 5 BHK • Price on Request

Super-luxury successor to The Camellias

Connect With Us

DLF

We'd love to hear from you. Fill in the form and our team will get back to you shortly.

Request a Callback

Back

Good to Know

What is the Tricity highway push all about?
It refers to a Rs 5,278-crore National Highway package covering three projects — the Zirakpur-Kurali Greenfield Highway, the Zirakpur Bypass, and the Chandigarh Airport-Aerocity Greenfield Highway — aimed at easing traffic across Chandigarh, Mohali, Panchkula and Zirakpur.
Has any part of this highway package already opened?
Yes, the 31.23-km Zirakpur-Kurali Greenfield Highway opened to public traffic on December 22, 2025, connecting IT Chowk near Chandigarh Airport with the Kurali-Chandigarh Road.
When will the Zirakpur Bypass and Airport-Aerocity highway be completed?
Both projects were formally inaugurated for construction by the Prime Minister on July 17, 2026, alongside the operational Zirakpur-Kurali stretch. Exact completion timelines depend on land acquisition and construction progress, so buyers should track official NHAI updates.
How does this affect DLF properties in the Tricity?
DLF has residential developments across Panchkula (The Valley, The Valley Gardens), Mullanpur/New Chandigarh (Hyde Park Estate) and Mohali. Improved highway connectivity to Chandigarh Airport and reduced congestion at key choke points can strengthen commute convenience and long-term value for these addresses.
Which areas benefit most from the new greenfield highways?
Zirakpur, Mohali's Aerocity, Kurali, Panchkula and the areas around Chandigarh International Airport are expected to see the most direct traffic relief, since these corridors specifically target through-traffic diversion around these zones.
Is this part of a larger ring road plan?
Yes, these three projects are part of the broader 244-km Tricity Ring Road vision, which is designed to permanently divert inter-state and long-distance traffic away from the congested urban core of Chandigarh, Mohali and Panchkula.
Will property prices rise because of these highways?
Better connectivity historically supports demand in peri-urban zones near new infrastructure, though exact price movements depend on execution timelines, local supply, and overall market conditions. Buyers should treat this as a medium-to-long-term value driver rather than an immediate price trigger.
Are there DLF projects specifically near these new highway corridors?
DLF's Panchkula developments (The Valley and The Valley Gardens, Sector 3) sit along NH-5 toward the Shivalik foothills, while Hyde Park Estate in Mullanpur is positioned near New Chandigarh's growing infrastructure, both benefiting indirectly from improved Tricity-wide connectivity.
What caused delays in these highway projects earlier?
The Zirakpur-Kurali highway faced repeated delays through 2025 primarily due to land acquisition issues and opposition from local landowners and farmers over access roads near proposed toll plazas, which were later resolved through negotiation with NHAI.
Where can I verify the official status of these highway projects?
Updates are typically released by the National Highways Authority of India (NHAI) and reported by regional publications; buyers should also confirm project-specific RERA details for any residential development directly through the respective state RERA portal.

Everything on this page is intended purely as a guide and creates no binding obligation. Details such as pricing, dimensions, and imagery can change without prior notice. Kindly cross-check all information before making a decision. About · Projects